Home About us Products & Services Infrastructure Div. Architectural Div. Trading Approvals Clients Contact us
 
Turnkey Mechanical Projects
Manufacturing
Current Infrastructure Porjects
Download our E - Brochure
Infrastructure - Bridges & Skywalk
We have been undertaking contract for various foot over bridges. Our recent projects are in and around Navi Mumbai area
Ulhasnagar Skywalk
 
 
1. This 50 crore project till now includes two skywalks linked together as well as with the ulhasnagar railway bridge.
2. This project is under inspection of i.r.s. . This developed infrastructure will help the commuters of both east and west.
3. The width of the skywalk(west) is 7mtr and that of the east is 4mtr.
4. It provides with four crossing about 40 mtr span length, over valdhuni nala.
5. All structural items are manufactured in carbon steel material about 1800 metric ton for west and 600 metric ton for east with ss railings.
6. Roofing is of polycarbonate sheet.
7. The shops are also planned on the 7 mtr stretch over valdhuni nala. The anti-skid tiles are being used for the flooring which will be relief for the commuters in the monsoon.
8. Aluminium composite panels (acp) are used below the floor on the outer bottom side of the skywalk.
 
Recent Foot Over Bridges
Various foot over bridges work executed in and around Navi Mumbai area
1. AIROLI
  The width of the bridge is 3m and the length is 27 metres.
2. PAWANE
  The width is 3m while the length is 30m.It consist of one foot over bridge.
3. TURBHE
  The width of the first footover bridge is 3m while the length is 20m. The width of the second foot over bridge is 3m and the length is 32m.
  The foot over bridge at these locations are under Thane – Belapur road widening project package III.
  MS IS2062 is used in the construction of all the three mentioned foot over bridges.
 
Contact Us    Jagdish Bldg, Plot No. 185, 3rd floor, 15th Rd, Chembur, Mumbai-400071, India. Tel No: 91-22-25281688/89, Email: consite@mtnl.net.in